Monday, May 6, 2019

Entry 7 (5-5-19)


Alex Muromcew
Senior Project
5/5/19

Today we took another day to prepare for lobstering. This time we went about acquiring a boat so that we could drop lobster traps. The boat that we are going to be using was being held in Duxbury, about a half hours drive away. To get the boat into the water, we had to help out with moving the boat off of the dry dock. From here we took the boat back to Hingham along the coast. The boat ride took almost 3 hours with high winds and chop during the chilly 45 degree afternoon. Our challenges took form as the fog rolled in and the wind picked up. However our focus was averted to the whales breaching the surface as we sailed past Stellwagen Banks. After arriving back in Hingham we moored our boat, and retreated back to the house to continue planning out our next high jinks.
 





Hours for the Day: 4.5 Hours
Drive down: .5 Hours
Boat up: 3 Hours
Setup: .5 Hours
Correspondence: .5 Hours

Total Hours: 32 Hours

No comments:

Post a Comment